|
The guillotine gates on the left have been raised to let us pass across the aqueduct to the lift. |
![]() |
||||
|
Narrowboat crossing the aqueduct and heading for the left hand caisson. Operators cabin can be seen ahead. |
![]() |
||||
|
Moving onto the lift beneath the operators cabin. |
![]() |
||||
|
Looking back the operators cabin can be seen high above and the other caisson is on its way to the top on the left. The two guillotine gates holding back the upper waters can be clearly seen. |
![]() |
||||
|
View to the left of the lift showing the Visitor Centre marquee and the River Weaver. |
![]() |
||||
|
One of the operators crossing the catwalk. |
![]() |
||||
|
View beneath the right hand caisson as it rises, showing the hydraulic ram which operates the lift. |
![]() |
||||
|
Looking back towards the operators cabin with the underside of the right caisson, hydraulic ram and cross support clearly visible. The right caisson is almost at the top now. |
![]() |
||||
|
The guillotine gates on the caisson and at the bottom of the lift have been raised and the River Weaver awaits! |
![]() |
||||
|
|||||